Electromechanical installation, and associated civil works of three major power substations for distribution at 138 KV and transformation from 138/69 KV at: Palmara, Santo Domingo; Canabacoa, Santiago de los Caballeros; and San Pedro de Macoris. The state-owned Electric Power Corporation of South Korea (KEPCO) has won, thanks to the quality and reputation of its construction products, the contract for the construction of electric substations and the establishment of the electric power distribution system in Santo Domingo, the capital of. This project involves the establishment and reinforcement of three distribution substations in Santo Domingo, the capital of the Dominican Republic, by KEPCO using the EPC (Engineering, Procurement, and Construction) method. Edesur Dominicana has launched a strategic overhaul of its power grid. This dataset gives a full overview of the current (up to 2022) transmission grid infrastructure of Dominican Republic including power plants, power stations, power towers and power lines with attributes such as length, assumed voltage level etc. The dataset was produced by using smart tracing. How many substations does the Dominican Power Base Station have? European-style prefabricated substations have become essential equipment in industrial plants, mining enterprises, residential communities, renewable energy stations, and urban power distribution networks. Their compact design. Generation capacity is shared among the different companies as follows: Source: Electricity Superintendence Statistics The transmission system, which is under the full responsibility of the state-owned company ETED (Electricity Transmission Company), consists of 940 km of 138kV single-line.